Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

The construction industry is as big as it is important. Without construction, our society would cease to...
BD$45.11 BMD
BD$45.11 BMD
SKU: 9798887501581
Product Type: Books
Please hurry! Only 333 left in stock
Author: Todd R. Zabelle
Format: Hardcover
Language: English
Subtotal: BD$45.11
10 customers are viewing this product
Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It by R. Zabelle, Todd

Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

BD$45.11

Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

BD$45.11
Author: Todd R. Zabelle
Format: Hardcover
Language: English

The construction industry is as big as it is important. Without construction, our society would cease to be. We would have no ports, roads, or bridges. No communications networks, power grids, or water systems. No hospitals. No schools. No homes.

But we can barely get anything built. Capital projects are routinely finished late and over budget. Everyone acknowledges the problem, but no one seems to have the vision, or the will, to fix it.

The problem is the separation of "planning" from "doing" that has taken place over the last century. A misplaced focus on administration has marginalized the tasks of designing and building, which are the essence of construction.

New techniques and cutting-edge technology provide us with a different way of doing things. This is not mere theory; as author Todd Zabelle demonstrates, his company and other innovative firms are doing it now. But because too many construction professionals are set in their ways or are profiting from an ineffective system, nothing changes.

By drawing on operations science and focusing on the critical aspects of construction and on how we design, make, and build instead of administration, we can fix what has dogged the industry for decades while expanding the bottom line of owners, investors, and construction managers.

As Built to Fail argues,

- we must recognize projects as an assemblage of multiple production systems and use operations science to understand and influence their behavior and thus improve project outcomes.
- the Taylorist preoccupation with squeezing as much work out of workers as possible is counterproductive. Having "materials waiting on workers" is avoided at all costs over "workers waiting on materials," but we don't need to choose between these two options. When it comes to supply, we can replace "just in case" (stacking up inventory) with "just in time" (delivering supplies when and where they are needed).
- the separation of design from construction and the fallacy that design is a phase that can be "finished" has contributed to the problem. Design is an ongoing process through the life of the project.
- deployment is changing from a centralized model to a decentralized one: instead of a project situated in one location, headed by one design firm and a single lead contractor and regulated by one permit, we must contend with multiple locations and jurisdictions, governed by numerous permits, various suppliers, and a multiplicity of design firms.
- the future is autonomous and digital. Yet few construction firms really know how to utilize this technology. Built to Fail explains how AI and machine learning along with IoT, can be fused with operations science and data science to jump ahead of the pack.



Author: Todd R. Zabelle
Publisher: Forbesbooks
Published: 01/16/2024
Pages: 288
Binding Type: Hardcover
Weight: 1.15lbs
Size: 9.10h x 6.00w x 1.20d
ISBN: 9798887501581

Returns Policy

You may return most new, unopened items within 30 days of delivery for a full refund. We'll also pay the return shipping costs if the return is a result of our error (you received an incorrect or defective item, etc.).

You should expect to receive your refund within four weeks of giving your package to the return shipper, however, in many cases you will receive a refund more quickly. This time period includes the transit time for us to receive your return from the shipper (5 to 10 business days), the time it takes us to process your return once we receive it (3 to 5 business days), and the time it takes your bank to process our refund request (5 to 10 business days).

If you need to return an item, simply login to your account, view the order using the "Complete Orders" link under the My Account menu and click the Return Item(s) button. We'll notify you via e-mail of your refund once we've received and processed the returned item.

Shipping

We can ship to virtually any address in the world. Note that there are restrictions on some products, and some products cannot be shipped to international destinations.

When you place an order, we will estimate shipping and delivery dates for you based on the availability of your items and the shipping options you choose. Depending on the shipping provider you choose, shipping date estimates may appear on the shipping quotes page.

Please also note that the shipping rates for many items we sell are weight-based. The weight of any such item can be found on its detail page. To reflect the policies of the shipping companies we use, all weights will be rounded up to the next full pound.

Related Products

Recently Viewed Products